Verdun Well Eckermann Rd

Any news of when the Somme well will start producing? What about the Geo Southern well close to Burton on 1697? Gonna start producing soon?

Link to completion report on Somme 1H/API 477-31082/Lease # 289105 http://webapps.rrc.texas.gov/CMPL/viewPdfReportFormAction.do?method=cmplG1FormPdf&packetSummaryId=229033

CLICK ON DOCUMENT TO ENLARGE

tswahr

The completion report Clint posted on the Somme shows Verdun ran the completion test in 2018 but for some reason they didn’t start regular production until November, 2019. The haven’t posted November, 2022 production yet and it’s possible Verdun shut the Somme in while they were fracing the two wells they recently drilled on the pad off 389 near Latium that ins’t far east of where the Somme lateral terminated. It looks like that is done and could be in production if they didn’t encounter problems. Their rig is currently drilling further east off Wolff Road.

There is a flare on the GS pad you asked about off 1697 near Burton and it looks like they are finally finished fracing those two allocation wells (Boeker-Union Hill AW-A and B) as well as the ones they drilled off 2502. The pipeline connects for all of them are finished so they may be producing now but first reports probably won’t show up on RRC or CONG for a couple more months.

This topic was automatically closed after 90 days. New replies are no longer allowed.