Does anyone have an update on the Staghorn well swing drilled in 28 11N 12W in Caddo county? Thank you

If you are talking about the Triple Crown 11-12-33-28 1HW, the well was spud on 9/9/23 and looks like a rig is still on location.

Any idea why they have not TD the well?

It can take five months to drill and complete a long well. Or they might have had mechanical trouble. They may be waiting on a frac crew. Posting completion reports usually takes another four months. Time will tell.

Perfect. Thank you. Much appreciated.

A notification of spud does not necessarily mean there is a rig on location capable of drill the well to total depth.

Rig has moved offsite now. The well is listed as DUC-drilled Uncompleted. I did not check the size of the previous rig to see if it was a spudder rig or full size. Time will tell.