Set conductor today on Charter Oak Tigris 1 near Wayne.
Getting close to M I R U. LET THE ADVENTURE BEGIN.
Do they skid the rig for two wells or do they kickoff for the second well? They only set one conductor.
It depends upon what kind of rig it is and what the plans for the pad are. Some rig settings have slots where they move the derrick over a few feet and drill a new surface pilot hole. Other rigs “walk” and skid over, others have to be moved.
Ty. Have you seen a permit yet, mbarnes?
I was expecting 2 south horizontal Woodfords each with huge 27 million gallon frac on Tigris 1.
Surface drilled and casing set. Building tank battery on location. Waiting for rotary.