OxyRock Wheatgrass Unit permits Sec.21&24, Blk 34, T1N Howard County
I see OxyRock has filed 6 new permits here. three are stacked laterals. Any idea how many horizontal legs will there be in each of the 3 permits that are “stacked laterals”?
Anyone now when they might start building locations and drilling?
Each permit has its own horizonal leg. They will scoot the rig over for each one. Note that the surface location is just a few feet different for each well. Crownquest Operatoing has a rig onsite and spud the S Wilkinson 336LL on Nov 2. The rig is sitting in A-1647, just off of Wilkinson Rd. The rig is on the middle well of the set of three heading south (under the set of four heading north.) Just a bit SW of the dry hole 35224.
THANK YOU FOR YOUR RESPONSE. Ii FOUND A TOTAL OF 7 PERMITS.
227 42625-31, 5 OF THE PERMIS SHOW AS “STACKED” AND 3 SHOW AS ALLOCATED WELLS. WIILL THE STACKED LATERALS HAVE AT LEAST TWO HZ LEGS PER PERMIT? IF SO THAT WOULD MEAN THAT WE SHOW PERMITS FOR 13 WELLS THAT GO THRU THE W/2 OF SECTION 21.
DO YOU THINK THEY WILL DRILL ALL OF THEM/ YOU SAID THEY STARTED DRILLING IN NOVEMEBR, CORRECT. THIS APPEARS TO BE A YEAR LONG PROJECT, ASSUMING WE HAVE 8-13 WELLS TO BE DRILLED AND FRAC.
I am not sure how they are using the term “stacked”. It could be that they are perforating two or more reservoirs in the same horizontal well. Only the operator knows how many will actually get drilled.
In looking at some data, it appears that the 5 well pad for OxyRock could drill one HZ well every 20± days, so 100 days ± to drill all 5 permits. Frac could take another 30 +days. Do you agree?
Only the operator knows for sure. I think the time frame is a bit short.