This well was permitted in 2018. Blk 49 sec 35 t9 Laura Mackenzie. Was permitted to 13000 feet but shows a depth of 2k on the rrc site. Wondering if it just didn’t work out and they moved on?

Looks like both the Laura McKenzie East and West laterals were only drilled to around 2000’ and set surface casing.

I am sure the plan was to come back with bigger rig and drilled the rest of the permitted well including the lateral.

Perhaps the operator (Battalion Oil) lost their funding and scrapped the project.

1 Like

PS Note - these two wells have had formal completion forms filed - wells are NOT plugged. Very easy for Battalion Oil or any other operator to use these two wellbores to drill horizontals wells from this pad

1 Like

Thanks for both your post. I have never run across this before and that is good information to know.

They also have 2 new permits in blk 48 sec 6 t9 that I’m hoping they complete.

Key to this play and its success will be how these laterals perform once they are frac’d and put on production.

Subsurface reservoir variability will impact the performance across the area - and production decline profile will be the factor that dictates which areas are economically viable vs those areas that are marginal to sub-economic.