Probability of a horizontal well

The surface location is often in an adjacent section. It takes about a 1/4-1/2 mile to make the turn, so they want to be able to shoot as many perforations as possible in the sections of interest starting just past the no-perf zones. There are no-perf zones along the section boundaries. That is to prevent drainage across the section boundaries.

2 Likes