Pooling order DUC well

Does an OCC pooling order remain in effect if a well is drilled but not completed? As with a DUC? Drilling completed but fracking not done?

That’s always a grey area. Has the term of the Order expired? Are there continuous operations? Most likely the operator has met the burden required under the Order.

1 Like

This topic was automatically closed after 90 days. New replies are no longer allowed.