Is there any information on these?
Sections 23 & 24, Township 14 North, Range 18 West, Custer County, Oklahoma
Is there any information on these?
Sections 23 & 24, Township 14 North, Range 18 West, Custer County, Oklahoma
Yes. Anthem Energy is actively developing Sections 23 and 24-14N-18W in Custer County.
Two horizontal wells have recently been spud:
Pea Eye Parker 2-23-14H API: 35-039-00119 Spud date: September 21, 2026
Newt Call 1-24-13H API: 35-039-00120 Spud date: September 22, 2026
Both wells are operated by Anthem Energy Operating (Oklahoma) LLC.
The OCC Form 1001A filings show that both wells were spud from surface locations in Section 26-14N-18W. The wells are horizontal developments involving acreage to the north, including Sections 23 and 24.
Where are the 1001a file reports?
My recommendation would be for you to Google “OCC Well Data Finder”. Find the black dot in Custer County in the sections you want, click on the name of the well, and then view the documents.
For each well, you can download and save each form 1000 and form 1001A.
As a side note I then upload these forms into ChatGPT or Gemini and ask AI how to interpret. Each form has an interesting story to tell.
If you decide to use the search by “operator”, Anthems operator number is 25106
Could you possibly find a document that shows they are filing additional requests? If you do find what I’m talking about would you mind explaining it?
I think I may have found what you’re asking about. Anthem filed several OCC applications associated with these wells before they were drilled.
For Newt Call 1-24-13H, which runs through Sections 24 and 13, Anthem requested a new 1,280-acre horizontal drilling and spacing unit for the Des Moines formation. As part of that application they also requested that some older spacing orders involving the Oswego, Skinner and Red Fork formations be vacated. The existing Red Fork spacing in Section 13 was specifically allowed to remain because there is an existing Red Fork well there. CD2026-002801_10_Application_Am…
Anthem also filed for a well-location exception for Newt Call. The OCC granted an emergency order allowing them to begin drilling before the final determination of that case. That was apparently important because Anthem planned to batch drill Newt Call and another well from the same pad and wanted to avoid moving or idling the drilling rig. 760605 - Location Exception Fin…
Pea Eye Parker 2-23-14H has a very similar location-exception case. Its permit identifies OCC case CD2026-003122 for the location exception and CD2026-002802 for the 1,280-acre Des Moines spacing covering Sections 14 and 23. Form 1000_Pea Eye Parker 2-23-1…
So if by “additional requests” you mean OCC applications beyond the drilling permits, yes, there definitely are some. They involve things like establishing the 1,280-acre Des Moines horizontal units, changing older spacing and obtaining location exceptions needed for the new horizontal wells.
If that’s what you were referring to, let me know and I’ll try to explain the individual filings in plain English. If you saw a different filing or request, give me the case number or a screenshot and I’ll see if I can find it.
Plain English would be very much appreciated. You are very helpful. I’m glad I found this forum.
My response has to be approved. Its detailed
How long does approval for a post usually take?
My initial response was not approved. It disappeared. I have responded again, it’s been sitting in the queue for approval for a day or so.
I guess no approval on your plain English again? Just wondering. I guess all of this is a slow roll. Thank you for trying to help me out with information.