Does anyone know the status of Percussion’s four permitted horizontal wells in Section 28, Block 27, PSL, Winkler County, Texas?
Stagecoach East (permitted), Stagecoach A/B/C are drilled/DUC status (i.e., waiting on completion). They are running 1 rig to the south (Ward) so may be a bit before the return to drill out.
This topic was automatically closed after 90 days. New replies are no longer allowed.