New Verdun Pad Site Near Shelby Hall

I’m thinking the three wells you said Verdun drilled from the pad off Wunderlich Road were the initial ones permitted in what they called the Passchendaele, Cantigny and Cambrai Units. Those were all permitted in Fayette Co. although part of the Passchendaele extends into Austin.

Verdun formed two more big units last year on the other side of Shelby that they called the Tannenberg and the Gallipoli that were permitted in Austin Co. The plats they filed show the initial wells in those two units being drilled from the same drill site south of 389 where Cutoff and Skull Creek Road intersect they had used to drill the Saint Mihiel and Belleau Wood wells at the end of 2019. Those SM and BW units join the south side of the new Tannenberg and Gallipoli units and the drill site sits in the middle.

If you are seeing another pad going in near the north corner of the Passchendaele unit and near the meeting hall, it must be for more wells they plan on drilling in the three units that join in that area.

Below is a cut and paste of the five unit plats Verdun filed that I put together to see how the boundaries match up. I marked where the other two drill sites are located.

Would the new pad you are talking about be close to that rectangular area that appears got left out of the Cantigny and Tannenberg units?

So far each of the laterals Verdun has permit were located right at the edge of each unit, apparently leaving room where four, five or more wells could be added in each of them, which would probably require another drill site somewhere in the middle. If those most recent wells they drilled can do 5-6 BCF in a little over two years like the Saint Mihiel and Belleau Wood that seems pretty logical.