Drove by the Baker 101H today… looks like it may be producing. There were two storage tanks installed on the pad and I could see what appeared to be a connection to a gas pipeline.
At the Lipsey site, it looked like they might be using coiled tubing to drill out the frac plugs. In addition, they are again pumping water into the frac lake, suggesting that more wells are planned in that area.
Baker 101H fracking was completed on 5/8. Taking approximately 14 days from start to finish. Have been bringing in new equipment for next stage. We have been told flow back test on or about June 2nd.