Drilling rig is still on site for Baker unit. Last information I received was should complete in a couple of weeks. Regarding Fracking, a Frac pond was built north east of Baker well. They are currently pumping from it to Frac the Whitaker well. They will use the same pond to Frac the Baker well.
2 Likes