Mitsui Lipsey Wells - Frac Job Is Imminent!

Drove by the wellsite this afternoon and there was a Liberty frac sign in place where the county road meets Highway 79. Crane was up above the well head, and there was a flare burning. I was told this probably indicates that a DFIT test has been done to measure permeability and help construct the frac design.

Lake was still full, so no water has been run, but it won’t be long!

Diagnostic-Fracture-Injection-Test-DFIT-Recommendations_revised-20Jul2023.pdf (718.7 KB)

1 Like