Mitsui Lipsey A 2H Update

Mitsui filed a completion report for this well on June 11. The 24-hour test results suggests this may be a very good well!

Test production was 38,927 MCF, on par with Comstock’s wells. The producing interval was only 6,145 feet, much shorter than the typical Comstock well (10,000 feet or longer). Will be interesting to see how the production figures look in the coming months.

https://webapps.rrc.state.tx.us/CMPL/viewPdfReportFormAction.do?method=cmplG1FormPdf&packetSummaryId=356568

4 Likes

Alan, Do you have any news on the Mitsui Ohenson well? What about reliable production data from the Expand Yancey well? Thanks

No info on either. No completion reports filed on either well yet.

Has anyone heard that the Mitsui Lipsey wells are going to be plugged? Someone told me they were due to very high h2s. I’m hoping this is wrong, but supposedly this is boots on the ground information.

1 Like

There was a report last week they one of the mitsui wells is producing 1.2M MCF a month.

1 Like

I think that photo is of the Kretzschmar PP 1H and PBH 1H wells right down the road from the 2 Lipsey wells Mitsui wells finished a couple months ago. I recognize the wellheads from an earlier visit to the pad

I thought exactly the same thing till I read the small caption. They are using a Comstock well to illustrate. Wish I could read past the paywall. Always looking for Mitsui updates.