Mitsui Frac Lake Update With Photos - 1/17/2026

Frac’ing is required for well completion, but it isn’t the conclusion. The flow back process starts once the frac job is finished. At some point, the operator will do a 24-hour production test and a completion report will be filed once that is done. The operator may or may not install production tubing before production starts.

Mitsui has had problems with the Baker well. The rig is still on site, and it has been there since October 3. I’ve heard rumors of a casing issue, but I don’t have any facts to report.