The Railroad Commission shows last March Centennial got a permit approved for what is called the Mercedes Bentz unit. It was proposed as an allocation well to be drilled from a site in Section 312, that joins 313 on the north, with the horizontal leg of the well to extend about half way into Section 313. Nothing has been filed yet with RRC showing whether it has been drilled.