Initial production for GD Farley 1H

Hello, Does anyone know the initial production for the GD Farley 1H? Thanks Joe

Date of first production was 3/13/2024, so no production posted yet on the Texas RRC site.

24-hour test was run on 3/28/2024 and the results were excellent:

38,375 MCF with 3.5 inch orifice

Pressure:

Shut in: 13,600

Flowing: 11,518

http://webapps.rrc.state.tx.us/CMPL/viewPdfReportFormAction.do?method=cmplG1FormPdf&packetSummaryId=312899

1 Like