Pecan pad Rig #1205 is leaving the site today. Spoke with person driving one of the “wide load” tucks and they said the rig is going to “the other side of Yoakum”…
I saw some of the equipment moving this morning west bound on FM 532 towards FM 1295…not sure if it turned south or kept west towards US 95….that is why I headed over there….
I have to make some calls about this, either way Milton is correct….6 weeks to drill Monster and 12 days total on Resiner is a huge difference…