Explosives. MIRU Casedhole Wireline. Wait on tools and tractor

CAN ANYONE TELL ME WHAT IS GOING ON WITH THIS WELL WITH THIS LANGUAGE? I DO NOT QUITE UNDERSTAND IT--THANKS

16:00 PM- Open well, RIH w/ Well Tech Tractor, CCL & Vision Overshot @ 2,600 psi csg pressure. Correlate

depth with liner top @ 10,443'. Check weight @ 10,900', 1060#. Weight @ 12,030', 1700#. Stall tractor @

12,758', Pick up 100' and go back down to 12,550'. End of tools @ 12,772'. TOH.

20:30 PM- OOH. Disarm guns, lay down fish. tractor and wireline tools. Make ready to plug and perf.

22:00 PM- Pressure test lines to 9,500 psi. Open well with 2,750 psi. Pump 50 bbl linear gel sweep, followed

by 570 bbl. flush @ 3-13 bpm w/ max pressure of 6,891 psi. 6,650 psi avg.

01:50 AM- R/U wireline and RIH w/ 3.70" dummy gun, correlate on depth with liner top @ 10,443' while

running in hole. pump tools down from 10,500' @ 2-10 BPM. Max press. of 6,000 psi to a depth of 20,070'.

POOH. RU & RIH with Cased Hole Solutions CCL , 2-3/4" wt. bar , 4 - 3-1/8'' Powerjet perf guns rigged for

6spf, 60 degree phasing, setting tool & Baker 3.40'' CFP. Correlate on depth with liner top @ 10,443' while

running in hole. Pump tools down from 10,450' @ 2-8 bpm. Max pressure of 6,100psi. Line tention of 1,700#

@ 390 ft/min to a depth of 20,070'. Position & set plug @ 20,005'. Position & perforate as per stage # 6

procedure @ 19,960', 19,925' 19,859' & 19,810'. All shots indicated to fire. POOH

They are perforating a frac stage.

Thank you–I now know what is going on–ARDIS