Primexx drilled their own SWD called the Baptist east of FM2448 and just north of CR310. Now they are drilling a new SWD 1.5 miles west of Hwy 17 on the south side of CR330. Both their SWDs will be served by the dual 12 inch produced water gathering/transport poly lines they’ve already installed over the area they are drilling up.
There’s so much produced water to be disposed of…even the SWD on my property operated by EnWater is not seeing any reduction in water disposal demand. EnWater is adding to the capacity of the SWD on my property…improving it so it will be able to dispose of 1 Million barrels of water each month…where it typically runs 400,000 a month now.