12,900 feet.
Ray:
It is hard to answer how long it will take to drill down 12,900’ due to variables in the drilling process. These include the measure of difficulty in subsurface drilling conditions as this could increase the number of bit trips. Also, mechanical problems with the rig could affect the total drill time.
Ray:
It is hard to answer how long it will take to drill down 12,900’ due to variables in the drilling process. These include the measure of difficulty in subsurface drilling conditions as this could increase the number of bit trips. Also, mechanical problems with the rig could affect the total drill time.
Ray:
It is hard to answer how long it will take to drill down 12,900’ due to variables in the drilling process. These include the measure of difficulty in subsurface drilling conditions as this could increase the number of bit trips. Also, mechanical problems with the rig could affect the total drill time.
Charles S. Mallory: Petrohawk has staked out two drilling sites to 12,900 in C-9, Section 19 and Section 20. They are permitted. Ray, thank you.
Ray:
I would estimate about 1 month more or less to drill to TD but the completion process (fracking, etc.) could last months depending on the availability of equipment.
Charles S. Mallory: Petrohawk has staked out two drilling sites to 12,900 in C-9, Section 19 and Section 20. They are permitted. Ray, thank you.