Rig is one location away from Tigris location. Lots of activity on new location: installed tank battery, high volume separator, and more. Frac tanks being spotted on location. I think they are going to reuse fluid from current hole. 15 5N 1W.
Rig moving on location today. Lots of commotion.
Rigging up lots of truck traffic. Road is breaking up.
Up and drilling, making good progress drilling the curve to horizontal now.
Tripping out since 1000. Now getting closer to the action there’s a fault there be careful.
Laying down drill pipe. Casing on location.
Getting ready to frac.
Large frac in progress.
Frac complete. Digging out equipment and tearing down. This was a large frac; now all frac fluid must be recovered.
Thank you for the updates.
1 Like
You are welcome Andrew.