Susan
Without having an expensive subscription (e.g. Drilling Info.com), the best way for you to stay up on new wells (i.e. permits and completions) is thru the Tx RRC site. They publish new permits and new completions once they are filed. Plus they locate these wells on their GIS map site.
I have checked and there have been no new permits (and therefore no new drilling) in A-268 over the past year.
Wildhorse does have a horizontal well (Bennett B 7H) that has been drilled in an adjacent survey to the east of A-268 about 1-2 miles away. Although this well is not yet formally completed, there is production filed for it in the "pending" category on the Tx RRC site. This well (Bennett B 7H) has been producing since July 2017 / production has been "OK" during this period. This appears to be a gas well (which makes sense due to location in the trend) with a max gas rate of about 1.8 MMCF per day with max condensate rate of about 150 BPD. However, there is no way to know if this well is being choked back or if this is full well production capacity.
Just have to wait for more info including the completion data / filing.