In 22N-3W, they have filed for poolings in Sections 2, 3, 10, 21, 28, 35, and permits for drilling on 2 and 3. In 2, they were ordered to pay $600 for 3/16th; in 10, it was 600 for 3/16th or 500 for 1/5th. In 21, it was only 200 for 3/16th and 100 for 1/5th.