There are four red circles - two as the surface location and two at the TD of the lateral.
At the surface, you have PSHL (proposed surface hole location - surface spud point) and PP/FTP (penetration point - for the EF / target -/ first take point).
At the end of the well, BHL is bottom hole location (end of the lateral) and LTP is last take point (last point perforated).
Note the footage calls off the lease / unit line plus the fact that well is being drilled as a "fish hook", i.e. not a straight direction from surface to TD).