# XTO Application to drill horizontal well in 8S-2E Sec. 1 and 12

**URL:** https://www.mineralrightsforum.com/t/xto-application-to-drill-horizontal-well-in-8s-2e-sec-1-and-12/50948
**Category:** Love County, OK
**Created:** [September 16, 2019, 11:38pm UTC](https://www.mineralrightsforum.com/t/xto-application-to-drill-horizontal-well-in-8s-2e-sec-1-and-12/50948 "2019-09-16T23:38:46Z")
**Posts on this page:** 2
**Page:** 1

<div class="post-metadata">

### Author: ![RSinOregon](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/3bc359/32.png) [@RSinOregon](https://www.mineralrightsforum.com/u/RSinOregon)
#### Post date: [September 16, 2019, 11:38pm UTC](https://www.mineralrightsforum.com/t/xto-application-to-drill-horizontal-well-in-8s-2e-sec-1-and-12/50948/1 "2019-09-16T23:38:46Z")

</div>

FYI all/update on activity. An application to drill has been made by XTO. Still new at this but it appears from the copy of the application I received to be a horizontal multi-unit well with a surface location of Section 12, 220’ from the north line and 1,056’ from the west line of the Section. Also a ‘completion interval’ in the SE1/4 of Section 1, Township 8 South, Range 2 East and another in Section 36, Township 7 South, Range 2 East "to produce hydrocarbons from the Woodford targeted reservoir at a depth of 28,039’ with approx. 50% of the completion interval in Section 1, Township 8 South, Range 2 East and 50% in Section 36, Township 7 South, Range 2 East. This is coupled with a request for 640 acre horizontal drilling and spacing unit. This should affect any lease bonuses being offered in the immediate area.

---

<div class="post-metadata">

### Author: ![MRFAdmin\_SV](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/m/e0b2c6/32.png) [@MRFAdmin\_SV](https://www.mineralrightsforum.com/u/MRFAdmin_SV)
#### Post date: [January 11, 2025, 6:05pm UTC](https://www.mineralrightsforum.com/t/xto-application-to-drill-horizontal-well-in-8s-2e-sec-1-and-12/50948/2 "2025-01-11T18:05:38Z")

</div>


