# Small rig starting drilling

**URL:** https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940
**Category:** Lavaca County, TX
**Created:** [September 3, 2013, 3:14pm UTC](https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940 "2013-09-03T15:14:04Z")
**Posts on this page:** 9
**Page:** 1

<div class="post-metadata">

### Author: ![Kedasim](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/k/d6d6ee/32.png) [@Kedasim](https://www.mineralrightsforum.com/u/Kedasim)
#### Post date: [September 3, 2013, 3:14pm UTC](https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940/1 "2013-09-03T15:14:04Z")

</div>

Does anyone know how long it takes one of the smaller rigs to do its job before the big skid rig is moved in. There has been a small rig drilling on the Pavlicek pad for almost a week now. Just wondering how the work flow moves when they start out with a smaller rig and then move to a skid.

Thanks all,

---

<div class="post-metadata">

### Author: ![RR11](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/8797f3/32.png) [@RR11](https://www.mineralrightsforum.com/u/RR11)
#### Post date: [September 4, 2013, 10:28pm UTC](https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940/2 "2013-09-04T22:28:28Z")

</div>

Sounds like a possible experimental rig. They sometimes use these if they are not sure of the area to run test. If the test check out positive then they send in the larger rig, if not they move on.

---

<div class="post-metadata">

### Author: ![Kedasim](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/k/d6d6ee/32.png) [@Kedasim](https://www.mineralrightsforum.com/u/Kedasim)
#### Post date: [September 5, 2013, 1:26pm UTC](https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940/3 "2013-09-05T13:26:12Z")

</div>

They are setting casing so I doubt it is an experimental rig. Should be a spudder rig from and email I got from another memeber. They drill down 4000 to 5000 feet and set casing for the bigger horizontal drill rig.

---

<div class="post-metadata">

### Author: ![RR11](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/8797f3/32.png) [@RR11](https://www.mineralrightsforum.com/u/RR11)
#### Post date: [September 5, 2013, 10:06pm UTC](https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940/4 "2013-09-05T22:06:00Z")

</div>

Yes if they are setting casing then they are using the spudder rig to save on cost.

---

<div class="post-metadata">

### Author: ![RR11](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/8797f3/32.png) [@RR11](https://www.mineralrightsforum.com/u/RR11)
#### Post date: [September 11, 2013, 3:15pm UTC](https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940/5 "2013-09-11T15:15:14Z")

</div>

Can someone please give me an update on the Pavlicek unit. On Tuesday i saw them moving allot of equipment away from the site, but i have not seen the new large rig yet

Thanks

---

<div class="post-metadata">

### Author: ![Kedasim](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/k/d6d6ee/32.png) [@Kedasim](https://www.mineralrightsforum.com/u/Kedasim)
#### Post date: [September 12, 2013, 1:39pm UTC](https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940/6 "2013-09-12T13:39:54Z")

</div>

RR,

My aunt was told by a landman that the large rig should be there soon. Now I don't know what soon means but Pioneer gets paid for drilling wells so I would guess they are going to get there as quick as possible. Date we were told was by Oct 15. So a month or less.

Have a blessed day,

Kedasim

---

<div class="post-metadata">

### Author: ![RR11](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/8797f3/32.png) [@RR11](https://www.mineralrightsforum.com/u/RR11)
#### Post date: [September 12, 2013, 3:43pm UTC](https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940/7 "2013-09-12T15:43:13Z")

</div>

Thanks for the info.

---

<div class="post-metadata">

### Author: ![Kedasim](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/k/d6d6ee/32.png) [@Kedasim](https://www.mineralrightsforum.com/u/Kedasim)
#### Post date: [September 13, 2013, 2:49pm UTC](https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940/8 "2013-09-13T14:49:10Z")

</div>

Gravel trucks and grader dumping gravel and spreading at the pad site yesterday per mom

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [August 15, 2018, 1:17am UTC](https://www.mineralrightsforum.com/t/small-rig-starting-drilling/12940/9 "2018-08-15T01:17:24Z")

</div>


