# SM Energy Big Jake Pad Dawson County

**URL:** https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169
**Category:** Dawson County, TX
**Created:** [August 27, 2026, 7:05pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169 "2026-08-27T19:05:31Z")
**Posts on this page:** 13
**Page:** 1

<div class="post-metadata">

### Author: ![WinklerLabrador](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/w/e8c25b/32.png) [@WinklerLabrador](https://www.mineralrightsforum.com/u/WinklerLabrador)
#### Post date: [August 27, 2026, 7:05pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/1 "2026-08-27T19:05:31Z")

</div>

Satellite imagery from a pad in Dawson but no permits issued… this is what Google has to say about the image.

Yes, this satellite image captures a **multi-well pad complex** during active development in the **[Midland Basin](https://www.google.com/goto?url=CAESXgHrOzAVOliVKd2Xms2WayNoa8G__EDeBYKsanKiQgrL74wfBq95vFO4YAVpiNvdfpnzZ6vRTTqwCpVZ6T8cjGRhz4hXc99YQkp0B_lgFn8rm7rHNFQ9nPy1XSFezjE)**. In modern **[Permian Basin](https://www.google.com/goto?url=CAESSQHrOzAVsC3t7jRcWbQFvAjcDGzhiKyxRJTgZjWjHJod4Yd3_kTzEpM-hx5MZZx-66gfwuJPwwxJB3D9ExCZ9QRZZ1hyK0zJZHY)** operations, companies use a “factory” or **[cube development approach](https://www.google.com/goto?url=CAESpAEB6zswFQcZHIa1IG0LwwYzKZzKq8F16LlXo7T8I5yMc5dJHlzrX35fqgTC30yX_HPVOKPxNWzXr0b-vSPhaRSRNvlHFQuordAjD-sOgd6FDQdP4sW7rLw4Mq4fDcg44nR32Vj8BVYbUZZJTg3mfTSHbgvoWGppIjke8O0Ww47SPgOIpRS6GgKTVk7szjYbWRjgrtMV6d_RzNm4EQVQr1CQpq4N5w)** to drill and complete multiple horizontal wells from a single surface footprint. [[1](https://www.google.com/goto?url=CAESSQHrOzAVsC3t7jRcWbQFvAjcDGzhiKyxRJTgZjWjHJod4Yd3_kTzEpM-hx5MZZx-66gfwuJPwwxJB3D9ExCZ9QRZZ1hyK0zJZHY), [2](https://www.google.com/goto?url=CAESXgHrOzAVOliVKd2Xms2WayNoa8G__EDeBYKsanKiQgrL74wfBq95vFO4YAVpiNvdfpnzZ6vRTTqwCpVZ6T8cjGRhz4hXc99YQkp0B_lgFn8rm7rHNFQ9nPy1XSFezjE), [3](https://www.google.com/goto?url=CAESpAEB6zswFQcZHIa1IG0LwwYzKZzKq8F16LlXo7T8I5yMc5dJHlzrX35fqgTC30yX_HPVOKPxNWzXr0b-vSPhaRSRNvlHFQuordAjD-sOgd6FDQdP4sW7rLw4Mq4fDcg44nR32Vj8BVYbUZZJTg3mfTSHbgvoWGppIjke8O0Ww47SPgOIpRS6GgKTVk7szjYbWRjgrtMV6d_RzNm4EQVQr1CQpq4N5w)]

The aerial layout reveals the highly structured layout of temporary industrial infrastructure required for these tight shale operations: [[1](https://www.google.com/goto?url=CAESmQEB6zswFYNXj0yMdII13icjs12zqFUZOwWbjBNVGeKhU_etZxhmtrVCRakC1Dm8thXwxmPr3_fABz7p4uQQZqqeLXLS21ge4hkfDTi7xkZT0f5Nd3XpnoprV8qh-3D-XmAoF1QguGxAaqCNs3kVqL1F-DrWOQVg3OrtV2WwxeGGREKKq59snxdqP4OdGBnzuOZb6MFZSy0lLd4)]

- **The Drilling Rig and Mast:** Located near the center-left, cast against its own dark shadow extending onto the caliche pad.
- **The Wellheads/Cellars:** Arranged in a tight, parallel line (the “well row”) allowing the rig to slide from one well to the next along integrated walking rails. [[1](https://www.google.com/goto?url=CAESkQEB6zswFS8IMN7125ZhX5CgwN6A4YNjii-IlmwCk0IP9FeGO4-jQjkr5fS9AfZc_-5fdctiuhfIbqcOLEE_eeIWgpJYE0o7zuBI67faQkb2VRNPyw2_1bJvuLNzQ1Ethp_BFbiqDgb_5PyBq8wOH9TA3r4Dwgik4vc_e8bSOsr_zTNZQdcRK7YLGak4e8ZWNsYa), [2](https://www.google.com/goto?url=CAESWAHrOzAVuMddH6_liLpdSluU_ViqAdtPNN5qqBySSfCnP9baFZoJ-YeRtKjq8Hlp1Kk6RNa0wL92I3PpzypbbnJC8eosfetm-qOiYZYxc392CHrqJ_jrkI4)]
- **Fluid Management & Tanks:** The large, dark-lined rectangle in the top right is a temporary lined mud pit or water containment impoundment, paired with rows of mobile frac tanks. [[1](https://www.google.com/goto?url=CAESWgHrOzAVoRZMSF_nsUzptEJt034bUwMYNtG0_HIa43Uxm69d2Ebrf1r1gLeBHz80B-ptCBRqosRQq5LvaFbB_Jz06vgOuB5oHY1jwLzqI5BuHuqKlHgQAXzoow)]
- **Logistics & Storage:** Multi-colored modular shipping containers and equipment trailers line the bottom perimeter, housing tools, electrical generators, and control hubs. [[1](https://www.google.com/goto?url=CAESjwEB6zswFe3eh1qd_P8C2CDXFMdD7lbzNGZ-9eR5ggM4KI6bHay20cMZv7NjdC00KjCGUgN76QDZ8VE_V_lSYDrl5kkuSHt0kxYgYEDitWvt-FP5ylnxCGF4x0mEoAG_cO__bDTXgMz8CPN5hpQ0SklkGpp_nfKxg_bR_0EexLJI5DE5II2SJfjyNf2-XvNi-g)]
- **Support Fleet:** Dozens of support trucks and crew vehicles line the cleared perimeter and access roads. [[1](https://www.google.com/goto?url=CAEScgHrOzAVu5JAAwESzCs4_RHhNdpUYXHOxjfA4OuunxznW0bkN_vL844csIKYRqvw3RLyfKK6xO_0Ev28BgTbFDiAm9Aq-FJwmm4yE796P41guZ63Vl1sodeFerLHC80RcUWw00Xi9nqiMXTAMnFYaeBWeg), [2](https://www.google.com/goto?url=CAESXQHrOzAVkhC8-nHS_2My5-Rvq2j31KR1cRgpU7ZCMERYWP8eUO7cJOCYb8QG-qkufrTHXbOnkgZlfFJRMG82CE0N74sVUgeJJ6ihf8Cens8DmtVQtM3krLj59wvjew)]

 ![dddddd](https://www.mineralrightsforum.com/uploads/db5755/original/3X/f/6/f6b0a5bc877fded95bea6fafe1f209a8fbb767ca.jpeg)

Anyone have any idea what SM is going? Google says the HZ will be drilled from this pad to the north.

---

<div class="post-metadata">

### Author: ![M\_Barnes](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/m_barnes/32/10942_2.png) [@M\_Barnes](https://www.mineralrightsforum.com/u/M_Barnes)
#### Post date: [August 27, 2026, 7:33pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/2 "2026-08-27T19:33:54Z")

</div>

If it is the Big Jake A and B, the drilling goes to the south. Look at the location in the SE corner of section 4 for the surface location, Then go south for the two wells. Looks like then end right about at County Rd 30. Sections 9, 16, and 21. Is that the ones you are asking about? ![image|418x500] (upload://8GCNfbSvYA7l0Lg45dkfKLreH0U.jpeg)

---

<div class="post-metadata">

### Author: ![WinklerLabrador](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/w/e8c25b/32.png) [@WinklerLabrador](https://www.mineralrightsforum.com/u/WinklerLabrador)
#### Post date: [August 27, 2026, 8:13pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/3 "2026-08-27T20:13:42Z")

</div>

Yes, thats right.

Sorry, to clarify, the Big Jake wells are already drilled going southwardly. Google’s reference was to the new wells - they will be drilled northwardly, parallel to CR H and CR G.

---

<div class="post-metadata">

### Author: ![M\_Barnes](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/m_barnes/32/10942_2.png) [@M\_Barnes](https://www.mineralrightsforum.com/u/M_Barnes)
#### Post date: [August 27, 2026, 8:25pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/4 "2026-08-27T20:25:27Z")

</div>

I do not see the new permits on the RRC GIS map yet if from the same pad.

---

<div class="post-metadata">

### Author: ![George\_D\_Cato](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/george_d_cato/32/3578_2.png) [@George\_D\_Cato](https://www.mineralrightsforum.com/u/George_D_Cato)
#### Post date: [August 27, 2026, 8:52pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/5 "2026-08-27T20:52:04Z")

</div>

What is the location? Section, Block etc

---

<div class="post-metadata">

### Author: ![WinklerLabrador](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/w/e8c25b/32.png) [@WinklerLabrador](https://www.mineralrightsforum.com/u/WinklerLabrador)
#### Post date: [August 27, 2026, 10:32pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/6 "2026-08-27T22:32:19Z")

</div>

@M_Barnes correct, no permit(s) yet. Per Google summary, it seems to be a lot of potential activity this early in the process, right? I would have thought SM would have issued permits before moving so much equipment to the pad site.

@George_D_Cato Dawson County, TX BLK 36 T4N Section 4 - the Big Jake pad is in the SE corner of Section 4, and the 2 Big Jake laterals are drilled southwardly.

---

<div class="post-metadata">

### Author: ![TennisDaze](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/t/dbc845/32.png) [@TennisDaze](https://www.mineralrightsforum.com/u/TennisDaze)
#### Post date: [August 27, 2026, 11:24pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/7 "2026-08-27T23:24:51Z")

</div>

That is a screen shot of the location for Big Jakes wells from some time ago. It is not a live photo from this morning.

---

<div class="post-metadata">

### Author: ![tracy\_lenz](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/tracy_lenz/32/16103_2.png) [@tracy\_lenz](https://www.mineralrightsforum.com/u/tracy_lenz)
#### Post date: [August 28, 2026, 5:50am UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/8 "2026-08-28T05:50:04Z")

</div>

Just chiming in that these are frac trucks and frac tanks. This is an active frac operation happening.

There is no drilling rig in that satellite image. There was a lot of AI-isms confidently explaining it not quite right 🙂

---

<div class="post-metadata">

### Author: ![WinklerLabrador](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/w/e8c25b/32.png) [@WinklerLabrador](https://www.mineralrightsforum.com/u/WinklerLabrador)
#### Post date: [August 28, 2026, 10:52am UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/9 "2026-08-28T10:52:12Z")

</div>

@TennisDaze Thank you - good to know the pad is currently clear. The image is supposed to be some time during July of this year.

@tracy_lenz Thanks - I think something might be happening on the pad because oil volume for the Big Jake wells significantly decreased during July.

---

<div class="post-metadata">

### Author: ![George\_D\_Cato](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/george_d_cato/32/3578_2.png) [@George\_D\_Cato](https://www.mineralrightsforum.com/u/George_D_Cato)
#### Post date: [August 28, 2026, 12:39pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/10 "2026-08-28T12:39:23Z")

</div>

Do any of you think this future development might involve the SW/4 of Section 40, Block 36, T5N, A-509? (About 2 miles north of the Big Jake pad) I own minerals there.

---

<div class="post-metadata">

### Author: ![M\_Barnes](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/m_barnes/32/10942_2.png) [@M\_Barnes](https://www.mineralrightsforum.com/u/M_Barnes)
#### Post date: [August 31, 2026, 8:29pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/11 "2026-08-31T20:29:20Z")

</div>

It depends upon how long the new Big Jake wells are permitted to be and if they angle to the west. Permits will tell when they are released.

---

<div class="post-metadata">

### Author: ![George\_D\_Cato](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/george_d_cato/32/3578_2.png) [@George\_D\_Cato](https://www.mineralrightsforum.com/u/George_D_Cato)
#### Post date: [August 31, 2026, 9:33pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/12 "2026-08-31T21:33:00Z")

</div>

Big Jake A & B (going south) are around 16,000 ft or about 3 miles. If they went north the same distance that would put them in my area. Unfortunately they seem to be hugging the east side.

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [November 25, 2026, 7:06pm UTC](https://www.mineralrightsforum.com/t/sm-energy-big-jake-pad-dawson-county/89169/13 "2026-11-25T19:06:09Z")

</div>

This topic was automatically closed after 90 days. New replies are no longer allowed.
