# Section 140 lot 40wa

**URL:** https://www.mineralrightsforum.com/t/section-140-lot-40wa/77900
**Category:** Ward County, TX
**Created:** [October 22, 2024, 1:56am UTC](https://www.mineralrightsforum.com/t/section-140-lot-40wa/77900 "2024-10-22T01:56:59Z")
**Posts on this page:** 3
**Page:** 1

<div class="post-metadata">

### Author: ![artsalazar56](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/a/ecae2f/32.png) [@artsalazar56](https://www.mineralrightsforum.com/u/artsalazar56)
#### Post date: [October 22, 2024, 1:57am UTC](https://www.mineralrightsforum.com/t/section-140-lot-40wa/77900/1 "2024-10-22T01:57:00Z")

</div>

We have 40 acres Waterbridge lease 10 acres to build and SWD lot 40 Section 190 in Ward County Texas who is responsible for the pipeline left behind.

---

<div class="post-metadata">

### Author: ![TennisDaze](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/t/dbc845/32.png) [@TennisDaze](https://www.mineralrightsforum.com/u/TennisDaze)
#### Post date: [October 22, 2024, 3:16am UTC](https://www.mineralrightsforum.com/t/section-140-lot-40wa/77900/2 "2024-10-22T03:16:21Z")

</div>

You should have a detailed lease regarding the SWD well and related operations. Review the provisions and see what provision applies.

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [January 20, 2025, 1:57am UTC](https://www.mineralrightsforum.com/t/section-140-lot-40wa/77900/3 "2025-01-20T01:57:25Z")

</div>

This topic was automatically closed after 90 days. New replies are no longer allowed.
