# PSI Bombs

**URL:** https://www.mineralrightsforum.com/t/psi-bombs/11291
**Category:** Oil and Gas Leasing Help
**Created:** [March 13, 2014, 2:25pm UTC](https://www.mineralrightsforum.com/t/psi-bombs/11291 "2014-03-13T14:25:56Z")
**Posts on this page:** 4
**Page:** 1

<div class="post-metadata">

### Author: ![Rooster\_wk](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/eb8c5e/32.png) [@Rooster\_wk](https://www.mineralrightsforum.com/u/Rooster_wk)
#### Post date: [March 13, 2014, 2:25pm UTC](https://www.mineralrightsforum.com/t/psi-bombs/11291/1 "2014-03-13T14:25:56Z")

</div>

Hello,

What does it mean when new, flowing well is shut in for PSI Bombs?

Thanks in advance.

---

<div class="post-metadata">

### Author: ![Steve\_Durrett](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/s/8baadc/32.png) [@Steve\_Durrett](https://www.mineralrightsforum.com/u/Steve_Durrett)
#### Post date: [March 13, 2014, 5:05pm UTC](https://www.mineralrightsforum.com/t/psi-bombs/11291/2 "2014-03-13T17:05:05Z")

</div>

They are lowering pressure gauges on a wire line down to the bottom of the well to measure the reservoir pressure (PSI). These gauges are called “bombs.” Depending on the type of test they are doing it could be shut in for several days or even weeks.

---

<div class="post-metadata">

### Author: ![Rooster\_wk](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/eb8c5e/32.png) [@Rooster\_wk](https://www.mineralrightsforum.com/u/Rooster_wk)
#### Post date: [March 13, 2014, 5:22pm UTC](https://www.mineralrightsforum.com/t/psi-bombs/11291/3 "2014-03-13T17:22:11Z")

</div>

Thanks much!

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [August 15, 2018, 12:51am UTC](https://www.mineralrightsforum.com/t/psi-bombs/11291/4 "2018-08-15T00:51:14Z")

</div>


