# Pooling

**URL:** https://www.mineralrightsforum.com/t/pooling/10692
**Category:** Oil and Gas Leasing Help
**Created:** [May 3, 2014, 10:52pm UTC](https://www.mineralrightsforum.com/t/pooling/10692 "2014-05-03T22:52:47Z")
**Posts on this page:** 3
**Page:** 1

<div class="post-metadata">

### Author: ![Joseph\_Caesar](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/joseph_caesar/32/1397_2.png) [@Joseph\_Caesar](https://www.mineralrightsforum.com/u/Joseph_Caesar)
#### Post date: [May 3, 2014, 10:52pm UTC](https://www.mineralrightsforum.com/t/pooling/10692/1 "2014-05-03T22:52:47Z")

</div>

Got letter from Reagan Smith Energy Solutions. Mt. Dora is communitizing Section 5-20N-5E. Do they mean the whole Section one square mile? Seems like a large area to pool.

---

<div class="post-metadata">

### Author: ![tim\_dowd](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/tim_dowd/32/23580_2.png) [@tim\_dowd](https://www.mineralrightsforum.com/u/tim_dowd)
#### Post date: [May 5, 2014, 12:51am UTC](https://www.mineralrightsforum.com/t/pooling/10692/2 "2014-05-05T00:51:49Z")

</div>

I think we need to define terms here. If the application is to pool in Oklahoma, that is compulsory pooling, forced pooling or statutory pooling, which is, essentially, compulsory leasing. If the application is to form a drilling and spacing unit, then that is spacing, which is somewhat equivalent to voluntary pooling in other states. But, the fact that a whole section is to spaced as to a specific formation, that is not unusual at all.

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [August 15, 2018, 12:41am UTC](https://www.mineralrightsforum.com/t/pooling/10692/3 "2018-08-15T00:41:38Z")

</div>


