# Pipeline Infrastrature under construction

**URL:** https://www.mineralrightsforum.com/t/pipeline-infrastrature-under-construction/86306
**Category:** Lavaca County, TX
**Created:** [March 3, 2026, 11:44pm UTC](https://www.mineralrightsforum.com/t/pipeline-infrastrature-under-construction/86306 "2026-03-03T23:44:32Z")
**Posts on this page:** 4
**Page:** 1

<div class="post-metadata">

### Author: ![LavacaCoMineralOwner](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/l/a8b319/32.png) [@LavacaCoMineralOwner](https://www.mineralrightsforum.com/u/LavacaCoMineralOwner)
#### Post date: [March 3, 2026, 11:44pm UTC](https://www.mineralrightsforum.com/t/pipeline-infrastrature-under-construction/86306/1 "2026-03-03T23:44:32Z")

</div>

Good Afternoon:

I am looking for information on any pipeline construction going on in Lavaca County to handle the movement of petroleum products. Has anyone heard anything about this? All feedback is appreciated and welcomed.

---

<div class="post-metadata">

### Author: ![M\_Barnes](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/m_barnes/32/10942_2.png) [@M\_Barnes](https://www.mineralrightsforum.com/u/M_Barnes)
#### Post date: [March 4, 2026, 1:26am UTC](https://www.mineralrightsforum.com/t/pipeline-infrastrature-under-construction/86306/2 "2026-03-04T01:26:41Z")

</div>

If you do an internet search “pipelines under construction in Lavaca county, Texas,” you will find updates on the DCP Guadalupe Pipeline 16" and the Permian Highway Pipeline by Kinder Morgan, etc.

RRC also has a state list.

> **[pdf\_2026-cy-pipeline-construction\_feb10-2026.pdf](https://www.rrc.state.tx.us/media/slyfbohn/pdf_2026-cy-pipeline-construction_feb10-2026.pdf)**
>
> 532.82 KB

---

<div class="post-metadata">

### Author: ![LKranch](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/l/e79b87/32.png) [@LKranch](https://www.mineralrightsforum.com/u/LKranch)
#### Post date: [March 4, 2026, 5:19am UTC](https://www.mineralrightsforum.com/t/pipeline-infrastrature-under-construction/86306/3 "2026-03-04T05:19:45Z")

</div>

I know they are using black poly pipe for gas and I was told salt water as well going to the gas distribution hub. Using regular steel pipe for petroleum. Was told up to 4 different pipes in the easement.

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [June 1, 2026, 11:45pm UTC](https://www.mineralrightsforum.com/t/pipeline-infrastrature-under-construction/86306/4 "2026-06-01T23:45:11Z")

</div>

This topic was automatically closed after 90 days. New replies are no longer allowed.
