# Permit issued on June 10, 2019

**URL:** https://www.mineralrightsforum.com/t/permit-issued-on-june-10-2019/47157
**Category:** Grady County, OK
**Created:** [June 12, 2019, 5:34am UTC](https://www.mineralrightsforum.com/t/permit-issued-on-june-10-2019/47157 "2019-06-12T05:34:13Z")
**Posts on this page:** 6
**Page:** 1

<div class="post-metadata">

### Author: ![graceful99](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/graceful99/32/9738_2.png) [@graceful99](https://www.mineralrightsforum.com/u/graceful99)
#### Post date: [June 12, 2019, 5:34am UTC](https://www.mineralrightsforum.com/t/permit-issued-on-june-10-2019/47157/1 "2019-06-12T05:34:13Z")

</div>

**Grady County** [BLACK MESA 0505 3-10 #1WH](https://clicks.aweber.com/y/ct/?l=FO9Wi&m=hkGSUlmz30OrwJc&b=FNBwr.9j9FajQnJsdiBJIw), June 10 2019 04 5N 5W NENENENE API: [05124655](https://clicks.aweber.com/y/ct/?l=FO9Wi&m=hkGSUlmz30OrwJc&b=3ZKnG.Ft9ZdMIjWk94CsMQ) Lat: 34.94159482381879, Long: -97.72422591584598 CAMINO NATURAL RESOURCES LLC HH, DR, 22955 ft, MISSISSIPPIAN(12010), SYCAMORE(12036), WOODFORD(12189), HUNTON(12397)

This permit is unclear to me. Does this include my Section 10-5N5W? It is actually listed under Section 4. None of the paperwork I have received has Section 4 as part of the proposed drilling. The paperwork I have shows only Sections 3 and 10. Thanks for your help.

---

<div class="post-metadata">

### Author: ![jake\_allen](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/jake_allen/32/2082_2.png) [@jake\_allen](https://www.mineralrightsforum.com/u/jake_allen)
#### Post date: [June 12, 2019, 10:55am UTC](https://www.mineralrightsforum.com/t/permit-issued-on-june-10-2019/47157/2 "2019-06-12T10:55:28Z")

</div>

According to the well plat attached, the surface location is in Section 4 but all the lateral is in Sections 3 and 10. Since the lateral starts in northern part of Section 3 and will be drilled into Section 10, it will include you if they get the well drilled as planned, with 50% in Section 10. It is possible, however, they will not get all the lateral drilled; sometimes that happens. Good luck.

[http://occpermit.com/WellBrowse/Webforms/WellInformation.aspx?ID=603147](http://occpermit.com/WellBrowse/Webforms/WellInformation.aspx?ID=603147)

---

<div class="post-metadata">

### Author: ![graceful99](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/graceful99/32/9738_2.png) [@graceful99](https://www.mineralrightsforum.com/u/graceful99)
#### Post date: [June 12, 2019, 6:44pm UTC](https://www.mineralrightsforum.com/t/permit-issued-on-june-10-2019/47157/3 "2019-06-12T18:44:59Z")

</div>

Thank you, Jake! I appreciate your response.

---

<div class="post-metadata">

### Author: ![graceful99](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/graceful99/32/9738_2.png) [@graceful99](https://www.mineralrightsforum.com/u/graceful99)
#### Post date: [June 13, 2019, 1:33am UTC](https://www.mineralrightsforum.com/t/permit-issued-on-june-10-2019/47157/4 "2019-06-13T01:33:53Z")

</div>

If I drove by these sections to see if there is any activity as far as getting ready to drill, where would I look, Section 3, 4, or 10? Are the plans to drill two or three wells?

---

<div class="post-metadata">

### Author: ![TODD\_M\_Baker](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/t/91b2a8/32.png) [@TODD\_M\_Baker](https://www.mineralrightsforum.com/u/TODD_M_Baker)
#### Post date: [June 13, 2019, 3:19am UTC](https://www.mineralrightsforum.com/t/permit-issued-on-june-10-2019/47157/5 "2019-06-13T03:19:50Z")

</div>

The NE corner of Section 4.

---

<div class="post-metadata">

### Author: ![MRFAdmin\_SV](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/m/e0b2c6/32.png) [@MRFAdmin\_SV](https://www.mineralrightsforum.com/u/MRFAdmin_SV)
#### Post date: [January 11, 2025, 6:11pm UTC](https://www.mineralrightsforum.com/t/permit-issued-on-june-10-2019/47157/6 "2025-01-11T18:11:26Z")

</div>


