# New drilling pad being built

**URL:** https://www.mineralrightsforum.com/t/new-drilling-pad-being-built/89913
**Category:** Custer County, OK
**Created:** [November 2, 2026, 12:38pm UTC](https://www.mineralrightsforum.com/t/new-drilling-pad-being-built/89913 "2026-11-02T12:38:48Z")
**Posts on this page:** 2
**Page:** 1

<div class="post-metadata">

### Author: ![RV7](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/a587f6/32.png) [@RV7](https://www.mineralrightsforum.com/u/RV7)
#### Post date: [November 2, 2026, 12:38pm UTC](https://www.mineralrightsforum.com/t/new-drilling-pad-being-built/89913/1 "2026-11-02T12:38:48Z")

</div>

There is a new pad being built in this Section 20-T12N-R15W Custer Co. Oklahoma Section. It is approximately center section close to the North line of the section. Normally new pads I see out here are in the corner of the section. At this early stage can the drilling plans be found? Such as lateral tenths, number of wells, operator, etc?

---

<div class="post-metadata">

### Author: ![M\_Barnes](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/m_barnes/32/10942_2.png) [@M\_Barnes](https://www.mineralrightsforum.com/u/M_Barnes)
#### Post date: [November 2, 2026, 5:17pm UTC](https://www.mineralrightsforum.com/t/new-drilling-pad-being-built/89913/2 "2026-11-02T17:17:00Z")

</div>

I do not see any new OCC cases or permits for that section or the surrounding ones. Usually if there is a new pad, there is a well name on the gate going into it. Teocalli (Melba Jean 1-20) and Jubilee (Stidham 1-20) have the two vertical gas wells that are already producing in the section.
