# Natural Gas Pipeline Right-Of-Way

**URL:** https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190
**Category:** Duchesne County, UT
**Created:** [June 12, 2019, 8:52pm UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190 "2019-06-12T20:52:38Z")
**Posts on this page:** 11
**Page:** 1

<div class="post-metadata">

### Author: ![Diddly](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/d/e19b73/32.png) [@Diddly](https://www.mineralrightsforum.com/u/Diddly)
#### Post date: [June 12, 2019, 8:52pm UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/1 "2019-06-12T20:52:38Z")

</div>

I am a landowner and have been contacted by a landsman that they will be conducting a survey for a route for a natural gas pipeline and associated liquids. What is the going rate for having a pipeline built on my land?

---

<div class="post-metadata">

### Author: ![Buddy\_Cotten](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/buddy_cotten/32/5079_2.png) [@Buddy\_Cotten](https://www.mineralrightsforum.com/u/Buddy_Cotten)
#### Post date: [June 12, 2019, 8:58pm UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/2 "2019-06-12T20:58:47Z")

</div>

My first suggestion would be to not allow entry until a Surface Access Agreement has been prepared and signed. You need to protect yourself and your land.

Best,

Buddy Cotten

---

<div class="post-metadata">

### Author: ![Diddly](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/d/e19b73/32.png) [@Diddly](https://www.mineralrightsforum.com/u/Diddly)
#### Post date: [June 12, 2019, 9:24pm UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/3 "2019-06-12T21:24:35Z")

</div>

Have that in agreement in place. Wondering what the going rate per foot might be. Thanks Buddy

---

<div class="post-metadata">

### Author: ![Buddy\_Cotten](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/buddy_cotten/32/5079_2.png) [@Buddy\_Cotten](https://www.mineralrightsforum.com/u/Buddy_Cotten)
#### Post date: [June 17, 2019, 5:46pm UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/4 "2019-06-17T17:46:09Z")

</div>

If I were negotiating this, I would begin at $3.00 per inch/foot. For example, a 20 inch pipeline would be valued at $60.00 per foot. That is on the high side, but you want to begin on the high side.

Good luck on this.

Buddy Cotten

---

<div class="post-metadata">

### Author: ![Diddly](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/d/e19b73/32.png) [@Diddly](https://www.mineralrightsforum.com/u/Diddly)
#### Post date: [June 17, 2019, 5:50pm UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/5 "2019-06-17T17:50:28Z")

</div>

Thanks for the input Buddy. Will take your advice and start on the high side…can always go down, but not the opposite. Thanks, Larry

---

<div class="post-metadata">

### Author: ![Phoenix\_92](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/phoenix_92/32/20421_2.png) [@Phoenix\_92](https://www.mineralrightsforum.com/u/Phoenix_92)
#### Post date: [August 16, 2024, 2:09pm UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/6 "2024-08-16T14:09:03Z")

</div>

Hello! Following up on this thread to ask how this went as I am going through the same right now. Thanks in advance.

---

<div class="post-metadata">

### Author: ![Ryan\_Fairbanks](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/ryan_fairbanks/32/18372_2.png) [@Ryan\_Fairbanks](https://www.mineralrightsforum.com/u/Ryan_Fairbanks)
#### Post date: [October 9, 2024, 3:52pm UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/7 "2024-10-09T15:52:26Z")

</div>

That’s pretty steep, but it’s a place to start for negotiating. There’s more to negotiate than the price. How much would it interfere with your use of the land, likely minimally. You need to decide how much, realistically, you use the land. Is it agriculturally productive? What would the land sell for? Would you consider selling the whole parcel? How is the best way to co-exist? Can you stay involved in the process and surveying so that you get some input on the route and start building a relationship with the company people that may need to come back for maintenance and repair?

I know ranchers that, during lean times and good-faith negotiations, right-of-way agreements made a survival difference for their operations.

---

<div class="post-metadata">

### Author: ![Phoenix\_92](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/phoenix_92/32/20421_2.png) [@Phoenix\_92](https://www.mineralrightsforum.com/u/Phoenix_92)
#### Post date: [October 9, 2024, 4:32pm UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/8 "2024-10-09T16:32:04Z")

</div>

Hello Ryan! What do you think a fair price is today?

---

<div class="post-metadata">

### Author: ![Ryan\_Fairbanks](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/ryan_fairbanks/32/18372_2.png) [@Ryan\_Fairbanks](https://www.mineralrightsforum.com/u/Ryan_Fairbanks)
#### Post date: [October 14, 2024, 10:28pm UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/9 "2024-10-14T22:28:43Z")

</div>

That really depends on a lot of factors, like the questions that I posed and the current market and the (production) field where it is located. Some operators and areas negotiate price based on a per rod figure for the length of the right-of-way. Others, depending on the use and width of the easement requested, may pay compensation on a per acreage basis. Is your property in Duchesne County?

---

<div class="post-metadata">

### Author: ![Cordelia](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/c/8dc957/32.png) [@Cordelia](https://www.mineralrightsforum.com/u/Cordelia)
#### Post date: [June 26, 2025, 2:22am UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/10 "2025-06-26T02:22:08Z")

</div>

Following up. Which gas company/operator was requesting the right of way for the natural gas pipeline? Did it get completed?

---

<div class="post-metadata">

### Author: ![Cordelia](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/c/8dc957/32.png) [@Cordelia](https://www.mineralrightsforum.com/u/Cordelia)
#### Post date: [October 13, 2026, 1:42am UTC](https://www.mineralrightsforum.com/t/natural-gas-pipeline-right-of-way/47190/11 "2026-10-13T01:42:30Z")

</div>

What is the status of your pipeline? Were you able to get the rod price you had negotiated for?
