# Memorandum of Lease

**URL:** https://www.mineralrightsforum.com/t/memorandum-of-lease/76147
**Category:** General Mineral Rights Discussion
**Created:** [June 26, 2024, 1:33pm UTC](https://www.mineralrightsforum.com/t/memorandum-of-lease/76147 "2024-06-26T13:33:57Z")
**Posts on this page:** 4
**Page:** 1

<div class="post-metadata">

### Author: ![Randy\_M](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/c37758/32.png) [@Randy\_M](https://www.mineralrightsforum.com/u/Randy_M)
#### Post date: [June 26, 2024, 1:33pm UTC](https://www.mineralrightsforum.com/t/memorandum-of-lease/76147/1 "2024-06-26T13:33:57Z")

</div>

If only the Memorandum of Lease has been filed, but in addition to the original lessee/operator a second operator is also drilling wells under my lease, how does the second operator know the terms of the lease? Is the original lessee/operator obligated to provide them copies? This is in Texas.

---

<div class="post-metadata">

### Author: ![Permian](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/p/b19c9b/32.png) [@Permian](https://www.mineralrightsforum.com/u/Permian)
#### Post date: [June 26, 2024, 2:23pm UTC](https://www.mineralrightsforum.com/t/memorandum-of-lease/76147/2 "2024-06-26T14:23:46Z")

</div>

They are not obligated but usually they work together in these situations, via a Joint Operating Agreement or something along those lines.

---

<div class="post-metadata">

### Author: ![James\_Garner1](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/james_garner1/32/20760_2.png) [@James\_Garner1](https://www.mineralrightsforum.com/u/James_Garner1)
#### Post date: [June 28, 2024, 4:00pm UTC](https://www.mineralrightsforum.com/t/memorandum-of-lease/76147/3 "2024-06-28T16:00:38Z")

</div>

Prior to drilling, the operator should perform a DSTO (drill site title opinion) in order to define working interest obligations for the well. This should require the examination of all OGLs since a Memo rarely is specific as to formations, depths, and other potential limits.

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [September 24, 2024, 1:33pm UTC](https://www.mineralrightsforum.com/t/memorandum-of-lease/76147/4 "2024-09-24T13:33:59Z")

</div>

This topic was automatically closed after 90 days. New replies are no longer allowed.
