# Love County Mobley

**URL:** https://www.mineralrightsforum.com/t/love-county-mobley/63014
**Category:** Love County, OK
**Created:** [August 31, 2021, 9:24pm UTC](https://www.mineralrightsforum.com/t/love-county-mobley/63014 "2021-08-31T21:24:14Z")
**Posts on this page:** 8
**Page:** 1

<div class="post-metadata">

### Author: ![RS16017](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/c67d28/32.png) [@RS16017](https://www.mineralrightsforum.com/u/RS16017)
#### Post date: [August 31, 2021, 9:24pm UTC](https://www.mineralrightsforum.com/t/love-county-mobley/63014/1 "2021-08-31T21:24:14Z")

</div>

No word on Mobley. Have all the wells shut down again?

---

<div class="post-metadata">

### Author: ![TODD\_M\_Baker](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/t/91b2a8/32.png) [@TODD\_M\_Baker](https://www.mineralrightsforum.com/u/TODD_M_Baker)
#### Post date: [August 31, 2021, 11:43pm UTC](https://www.mineralrightsforum.com/t/love-county-mobley/63014/2 "2021-08-31T23:43:55Z")

</div>

Give the legal description for the Mobley and someone may be able to help you.

---

<div class="post-metadata">

### Author: ![PeteR](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/p/278dde/32.png) [@PeteR](https://www.mineralrightsforum.com/u/PeteR)
#### Post date: [September 1, 2021, 1:58am UTC](https://www.mineralrightsforum.com/t/love-county-mobley/63014/3 "2021-09-01T01:58:52Z")

</div>

My guess is the Mobley being referenced is Mobley 1-21H28X33 API 35-085-21317, with a surface location in 21-6S-1W and bottomhole in 33-6S-1W. There is a report that the well was spud July 27,2020. OTC site lists well as active as of 06/08/2021, but no production posted yet.

---

<div class="post-metadata">

### Author: ![oklandman](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/o/dc4da7/32.png) [@oklandman](https://www.mineralrightsforum.com/u/oklandman)
#### Post date: [September 2, 2021, 11:05pm UTC](https://www.mineralrightsforum.com/t/love-county-mobley/63014/4 "2021-09-02T23:05:51Z")

</div>

I can’t confirm anything, but I’ve heard rumors that this well had some sort of an issue when being completed, I was told that is the reasoning of the delay on bringing this well online. Again I can’t confirm, just what I was told.

---

<div class="post-metadata">

### Author: ![ndian1954](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/n/f9ae1b/32.png) [@ndian1954](https://www.mineralrightsforum.com/u/ndian1954)
#### Post date: [September 19, 2021, 1:10pm UTC](https://www.mineralrightsforum.com/t/love-county-mobley/63014/5 "2021-09-19T13:10:47Z")

</div>

I have interest in this Mobley Well. . According to the OCC the first production date was June 8, 2021. 118 barrels a day of oil and 123 mcf of gas. Whether or not they are pumping everyday, I don’t know. Not seeing any sales on the Oklahoma Tax Commission site, but they are usually two to three months behind in their reporting.

---

<div class="post-metadata">

### Author: ![RS16017](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/c67d28/32.png) [@RS16017](https://www.mineralrightsforum.com/u/RS16017)
#### Post date: [October 13, 2021, 10:33pm UTC](https://www.mineralrightsforum.com/t/love-county-mobley/63014/6 "2021-10-13T22:33:19Z")

</div>

Couldn’t find production figures for XTO Mobley on OCC.

---

<div class="post-metadata">

### Author: ![ndian1954](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/n/f9ae1b/32.png) [@ndian1954](https://www.mineralrightsforum.com/u/ndian1954)
#### Post date: [October 14, 2021, 1:02pm UTC](https://www.mineralrightsforum.com/t/love-county-mobley/63014/7 "2021-10-14T13:02:18Z")

</div>

If you go to OCC well search and give them well location. The well name and number. The operator and operator number. You can find first production day June 8, 2021. 114 barrels of oil and 123mcf.of gas. There are no production figures beyond that. This doesn’t mean there is more production or there is not more production. It just means OCC has not been given any production figures. XTO is famous for slow finishing acts. Especially when it comes to division orders. Most likely we will not get a full accounting until after December 8, 2021. By law, I believe XTO Has 180 days from completion date(June 8. 2021)before division orders have to be assigned. Believe me. They will string this out until the witching hour.

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [November 29, 2021, 9:24pm UTC](https://www.mineralrightsforum.com/t/love-county-mobley/63014/8 "2021-11-29T21:24:48Z")

</div>

This topic was automatically closed after 90 days. New replies are no longer allowed.
