# Help with finding where a well will be placed

**URL:** https://www.mineralrightsforum.com/t/help-with-finding-where-a-well-will-be-placed/43006
**Category:** Canadian County, OK
**Created:** [March 13, 2019, 4:24am UTC](https://www.mineralrightsforum.com/t/help-with-finding-where-a-well-will-be-placed/43006 "2019-03-13T04:24:32Z")
**Posts on this page:** 5
**Page:** 1

<div class="post-metadata">

### Author: ![Stacy2](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/s/e9a140/32.png) [@Stacy2](https://www.mineralrightsforum.com/u/Stacy2)
#### Post date: [March 13, 2019, 4:24am UTC](https://www.mineralrightsforum.com/t/help-with-finding-where-a-well-will-be-placed/43006/1 "2019-03-13T04:24:32Z")

</div>

[occwellsection19.pdf](https://www.mineralrightsforum.com/uploads/db5755/original/2X/5/55292f1ed9edfde2f5b469312b79b4c199354611.pdf) (990.4 KB)

Section 19 13N 6W Also any idea when they may start? Thanks for any help. Just hoping they will be drilling in Section 30 since they combined the two.

---

<div class="post-metadata">

### Author: ![M\_Barnes](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/m_barnes/32/10942_2.png) [@M\_Barnes](https://www.mineralrightsforum.com/u/M_Barnes)
#### Post date: [March 13, 2019, 11:07pm UTC](https://www.mineralrightsforum.com/t/help-with-finding-where-a-well-will-be-placed/43006/2 "2019-03-13T23:07:45Z")

</div>

You will have to wait until the cases have been heard and have an order before getting a clue as to timing. The permit usually has either a six month time. The pooling would have a six month or one year time frame.

---

<div class="post-metadata">

### Author: ![Stacy2](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/s/e9a140/32.png) [@Stacy2](https://www.mineralrightsforum.com/u/Stacy2)
#### Post date: [March 14, 2019, 12:27am UTC](https://www.mineralrightsforum.com/t/help-with-finding-where-a-well-will-be-placed/43006/3 "2019-03-14T00:27:18Z")

</div>

I thought that map may give an indicator as to where they were planning to drill. Do they consider not putting it near someone’s home? Or is that not a consideration?

---

<div class="post-metadata">

### Author: ![M\_Barnes](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/m_barnes/32/10942_2.png) [@M\_Barnes](https://www.mineralrightsforum.com/u/M_Barnes)
#### Post date: [March 14, 2019, 12:41pm UTC](https://www.mineralrightsforum.com/t/help-with-finding-where-a-well-will-be-placed/43006/4 "2019-03-14T12:41:17Z")

</div>

When the permit is issued, it will usually post a map of where the planned surface location will be, the path of the wll and the bottom hole location. Many lease forms limit any drilling to be 200’ away from a home. They are usually looking for a fairly flat site (with a bit of help from a grader) close to the north or south edge of a section.

---

<div class="post-metadata">

### Author: ![MRFAdmin\_SV](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/m/e0b2c6/32.png) [@MRFAdmin\_SV](https://www.mineralrightsforum.com/u/MRFAdmin_SV)
#### Post date: [January 11, 2025, 6:18pm UTC](https://www.mineralrightsforum.com/t/help-with-finding-where-a-well-will-be-placed/43006/5 "2025-01-11T18:18:02Z")

</div>


