# Drilling Sec1-18N-25W

**URL:** https://www.mineralrightsforum.com/t/drilling-sec1-18n-25w/67603
**Category:** Ellis County, OK
**Created:** [August 22, 2022, 1:28pm UTC](https://www.mineralrightsforum.com/t/drilling-sec1-18n-25w/67603 "2022-08-22T13:28:31Z")
**Posts on this page:** 3
**Page:** 1

<div class="post-metadata">

### Author: ![Ruth\_jacobs](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/r/c57346/32.png) [@Ruth\_jacobs](https://www.mineralrightsforum.com/u/Ruth_jacobs)
#### Post date: [August 22, 2022, 1:28pm UTC](https://www.mineralrightsforum.com/t/drilling-sec1-18n-25w/67603/1 "2022-08-22T13:28:31Z")

</div>

Is there any information on when drilling is scheduled to begin in Section 1-18N-25W?

---

<div class="post-metadata">

### Author: ![M\_Barnes](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/m_barnes/32/10942_2.png) [@M\_Barnes](https://www.mineralrightsforum.com/u/M_Barnes)
#### Post date: [August 22, 2022, 1:49pm UTC](https://www.mineralrightsforum.com/t/drilling-sec1-18n-25w/67603/2 "2022-08-22T13:49:47Z")

</div>

The pooling order was dated May 3 and had a six month time frame from the date of the order. So hopefully by November.

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [November 20, 2022, 1:28pm UTC](https://www.mineralrightsforum.com/t/drilling-sec1-18n-25w/67603/3 "2022-11-20T13:28:36Z")

</div>

This topic was automatically closed after 90 days. New replies are no longer allowed.
