# Chesapeake Energy Bankruptcy Ends

**URL:** https://www.mineralrightsforum.com/t/chesapeake-energy-bankruptcy-ends/60595
**Category:** Burleson County, TX
**Created:** [February 12, 2021, 12:20am UTC](https://www.mineralrightsforum.com/t/chesapeake-energy-bankruptcy-ends/60595 "2021-02-12T00:20:29Z")
**Posts on this page:** 2
**Page:** 1

<div class="post-metadata">

### Author: ![Brerry\_Creak](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/brerry_creak/32/18318_2.png) [@Brerry\_Creak](https://www.mineralrightsforum.com/u/Brerry_Creak)
#### Post date: [February 12, 2021, 12:20am UTC](https://www.mineralrightsforum.com/t/chesapeake-energy-bankruptcy-ends/60595/1 "2021-02-12T00:20:30Z")

</div>

CHK announced on Feb 9th that they have exited chapter 11 bankruptcy. Included in their explanation of details, they indicated that they plan to operate six drilling rigs on average during 2021. According to Yahoo Finance, Chesapeake will be more focused on natural gas in their Marcellus and Haynesville operations and to a lesser degree Eagle Ford Shale oil in the Brazos Valley. Presently, they do not have any rigs operating in Brazos Valley according to their website (which may or may not be up to date).

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [May 13, 2021, 12:20am UTC](https://www.mineralrightsforum.com/t/chesapeake-energy-bankruptcy-ends/60595/2 "2021-05-13T00:20:33Z")

</div>

This topic was automatically closed after 90 days. New replies are no longer allowed.
