# Bull Run (EOG) Production Update - 8/7/2026

**URL:** https://www.mineralrightsforum.com/t/bull-run-eog-production-update-8-7-2026/88905
**Category:** Madison County, TX
**Created:** [August 8, 2026, 12:01am UTC](https://www.mineralrightsforum.com/t/bull-run-eog-production-update-8-7-2026/88905 "2026-08-08T00:01:01Z")
**Posts on this page:** 3
**Page:** 1

<div class="post-metadata">

### Author: ![Alan\_Herrington](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/a/b782af/32.png) [@Alan\_Herrington](https://www.mineralrightsforum.com/u/Alan_Herrington)
#### Post date: [August 8, 2026, 12:01am UTC](https://www.mineralrightsforum.com/t/bull-run-eog-production-update-8-7-2026/88905/1 "2026-08-08T00:01:01Z")

</div>

June production figures have been posted in the Comptroller’s CONG System. Here are the May and June oil production numbers for their Augustus Unit 1H well in Madison County:

 ![image](https://www.mineralrightsforum.com/uploads/db5755/original/3X/7/1/716cee82d8318c263442bde4836277197de31998.png)

Assuming June was a full month of production, the well averaged 444 BOPD.

And here are the numbers for their Hadrian Unit 1H in Robertson County:

 ![image](https://www.mineralrightsforum.com/uploads/db5755/original/3X/d/6/d68f1208c5aa277537da3d941d4d0c7b260c0255.png)

June oil production averaged 810 BOPD.

Bull Run is continuing to record leases in Madison and Leon Counties.

---

<div class="post-metadata">

### Author: ![caminogirl](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/caminogirl/32/23959_2.png) [@caminogirl](https://www.mineralrightsforum.com/u/caminogirl)
#### Post date: [August 9, 2026, 8:46pm UTC](https://www.mineralrightsforum.com/t/bull-run-eog-production-update-8-7-2026/88905/2 "2026-08-09T20:46:16Z")

</div>

Can anyone tell me how to get in touch with EOG or whomever is leasing for them in Madison County? I’d like to see what they would offer me for a lease in that area. Thank you.

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [November 6, 2026, 12:01am UTC](https://www.mineralrightsforum.com/t/bull-run-eog-production-update-8-7-2026/88905/3 "2026-11-06T00:01:48Z")

</div>

This topic was automatically closed after 90 days. New replies are no longer allowed.
