# 26/8/7 Grady County

**URL:** https://www.mineralrightsforum.com/t/26-8-7-grady-county/64318
**Category:** Grady County, OK
**Created:** [December 26, 2021, 12:07am UTC](https://www.mineralrightsforum.com/t/26-8-7-grady-county/64318 "2021-12-26T00:07:26Z")
**Posts on this page:** 6
**Page:** 1

<div class="post-metadata">

### Author: ![Sylvester\_W\_Brock\_Jr](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/sylvester_w_brock_jr/32/3439_2.png) [@Sylvester\_W\_Brock\_Jr](https://www.mineralrightsforum.com/u/Sylvester_W_Brock_Jr)
#### Post date: [December 26, 2021, 12:07am UTC](https://www.mineralrightsforum.com/t/26-8-7-grady-county/64318/1 "2021-12-26T00:07:26Z")

</div>

> Jusr got a notice of hearing for a horizontal wellin 26/8/6 County. Camino, strange thing is that the petition states that the company has drilled the (horizontal) well. I assumed that you had to get the permit beforehand. Was this an error in drafting or can you ask for retrospective approval?

---

<div class="post-metadata">

### Author: ![Don\_Bray](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/don_bray/32/16050_2.png) [@Don\_Bray](https://www.mineralrightsforum.com/u/Don_Bray)
#### Post date: [December 26, 2021, 1:56am UTC](https://www.mineralrightsforum.com/t/26-8-7-grady-county/64318/2 "2021-12-26T01:56:09Z")

</div>

Permit to drill dated 10/13/2021. Spud date of 11/21/2021.

Well Name: CLARA LUPER 0806 23-26-1WXH

Interim orders were to be reopened 12/21/2021

---

<div class="post-metadata">

### Author: ![M\_Barnes](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/m_barnes/32/10942_2.png) [@M\_Barnes](https://www.mineralrightsforum.com/u/M_Barnes)
#### Post date: [December 26, 2021, 7:24pm UTC](https://www.mineralrightsforum.com/t/26-8-7-grady-county/64318/3 "2021-12-26T19:24:42Z")

</div>

There were a whole set of cases that went with those two sections. Started back in September.  
202101942, 43, 202102295, 202102919, 202102920. Occasionally, they get a bit behind in the paperwork. The beginning estimate of 33% in Section 23 and 67% in section 26 will be adjusted once the survey of the well is completed. Since they are drilling a well north into 14 and a well south into 26, they may drill both of them before frac’ing to save money.

---

<div class="post-metadata">

### Author: ![TODD\_M\_Baker](https://www.mineralrightsforum.com/letter_avatar_proxy/v4/letter/t/91b2a8/32.png) [@TODD\_M\_Baker](https://www.mineralrightsforum.com/u/TODD_M_Baker)
#### Post date: [December 26, 2021, 8:54pm UTC](https://www.mineralrightsforum.com/t/26-8-7-grady-county/64318/4 "2021-12-26T20:54:53Z")

</div>

Camino drilled the Clara Luper well and will complete in the Mississippi formation. I imagine the hearing you are speaking about is to establish the proper section allocation for the percentage of perforations in each section. I doubt the well has been completed yet so these percentages will be temporary (33% to Sec. 23 & 66% to Sec. 26) and there will be another hearing to establish the exact percentages after such time as the completion is finished and they know the numbers. In a sense, the paperwork is nothing more than a formality. Hope you get a good one.

---

<div class="post-metadata">

### Author: ![jerry\_sparks](https://www.mineralrightsforum.com/user_avatar/www.mineralrightsforum.com/jerry_sparks/32/1515_2.png) [@jerry\_sparks](https://www.mineralrightsforum.com/u/jerry_sparks)
#### Post date: [March 4, 2022, 11:08pm UTC](https://www.mineralrightsforum.com/t/26-8-7-grady-county/64318/5 "2022-03-04T23:08:28Z")

</div>

The Clara Luper and Robert Kalsu both have been drilled and put online.

---

<div class="post-metadata">

### Author: ![system](https://www.mineralrightsforum.com/uploads/db5755/original/3X/6/c/6c7c56608c843272ad6e3662ce9562a5956f173e.png) [@system](https://www.mineralrightsforum.com/u/system)
#### Post date: [March 26, 2022, 12:08am UTC](https://www.mineralrightsforum.com/t/26-8-7-grady-county/64318/6 "2022-03-26T00:08:12Z")

</div>

This topic was automatically closed after 90 days. New replies are no longer allowed.
