Production numbers?

Ardis, the reporting isn’t instant. The operator will get around to reporting and then the state may delay getting the information posted. The well may be drilled and not yet fracked. The well is still just a yellow dot on the GIS server map. Watching the map for the next week or two may show a black dot with a wellbore off of it, or a black line denoting the wellbore with a green circle at the wellhead, denoting DRL status, which means it has not been completed. Even if you have the subscription, the state can’t post information until they get it. I know waiting isn’t easy, but another month should tell the tale.